S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
1 Pakistan Petroleum Limited Sui CP Audit of 88 Wells at Field in association with Gary International U.K. Ltd. 1995-96
2 Pakistan Petroleum Limited Sui Welding of 30 long 14inch dia metr full sleeves on 14 inch gas gathering main at Sui Gas Field 1996
3 Pakistan Petroleum Limited Sui Welding of 2 Nos. 6'-10" & 7'-6" long 30inchdia full sleeve on Compression 30 discharge pipe line 1997
4 Pakistan Petroleum Limited Adhi Welding work for Plant inlet manifold at Adhi Well No.12 1997
5 Pakistan Petroleum Limited Sui Welding of 8" 2 Nos. full dia sleeves on feeder line & replacement of 3 lengths 6" pipe line 1997
6 Pakistan Petroleum Limited Sui Welding of drain line at dehydration plant 1997
7 Pakistan Petroleum Limited Sui Supply & fabrication of steel clamps for 18" pipe line 1997
8 Sui Southern Gas Company Ltd Sui CP Consultancy in association with Gary International U.K. Ltd. For A Unit 1997
9 Pakistan Petroleum Limited Adhi CP Design for Adhi Well No.12 gasing & feeder line 1997
10 Pakistan Petroleum Limited Kandhkot Yearly maintenance CP System of Kandhkot Gas Field 1997
11 Pakistan Petroleum Limited Sui Construction & Installation of 4 Nos. Ground Beds for CP System 1997-98
12 Pakistan Petroleum Limited Sui Construction of 50 BBL trip tank for H-725 drilling out fit. 1998
13 Pakistan Petroleum Limited Sui Construction & installation of Ground Bed for CP System 1998
14 Pakistan Petroleum Limited Sui Repair of Thermo Electric Generators & Solar Power Units and spares installation for electronic panels. 1998
15 Pakistan Petroleum Limited Sui Construction of Hydrant System at DHP & TSHF, Sui Gas Field 1998-99
16 Pakistan Petroleum Limited Kandhkot Construction of Hydrant System at DHP & TSHF, Kandhkot Gas Field 1998-99
17 Pakistan Petroleum Limited Sui Hydro testing of 4 Nos. valves and 6" Tee, Sui Gas Field 1999
18 Pakistan Petroleum Limited Sui 20" dia pipe line coating & wrapping for 4.5 km at Sui Gas Field 1999
19 Pakistan Refinery Limited Karachi PCM Survey coating & wrapping as per recommendation of PRL for 16" & 18" Oil lines 1999
20 Pakistan Petroleum Limited Sui Repair of Chart Integrator / Flow Scanners at Sui Gas Field 1999
21 Pakistan Petroleum Limited Kandhkot Yearly maintenance of CP System, Kandhkot. 1999-2000
22 Pakistan Petroleum Limited Kandhkot Construction of Condensate / Oil storage tank, Kandhkot. 2000
23 Pakistan Petroleum Limited Adhi Welding, Fabrication, Installation & Testing Piping & Surface Fittings at Adhi Well No.9 2000
24 Pakistan Scientific Institute of Research Karachi Installation of HVAC System for auditorium of Institute of Industrial Electronic Engineers, Karachi 2000
25 Pakistan Petroleum Limited Adhi Welding, Fabrication, Installation & Testing of Piping wells & Surface Fittings at Well No.10, Adhi 2000
26 Pakistan Petroleum Limited Sui Fabrication, Installation & Welding of Well Head Surface Fitting & construction of 10" feeder line for Pub-2 Well 4.5 km, Sui Gas Field 2000
27 Attock Cement Factory Hub Design & construction of CP System at Attock Cement Factory for 8" gas pipeline & structure at Hub Baluchistan. 2001
28 Pakistan Petroleum Limited Sui Installation of above ground condensate drain line at Sui Field Gas Compressor Station 2001
29 Pakistan Petroleum Limited Sui Welding / installation / modification of 16" ball valve at North & South header, Sui Gas Field 2001
30 Pakistan Petroleum Limited Kandhkot Supply of manpower - Welder, Fabricator & Grinder man, Kandhkot Gas Field 2001
31 M/s Ayub Brothers Rawalpindi Installation of sacrificial anodes & Ground Bed of water pipe line diameter 36" at Rawalpindi 2001
32 Pakistan Petroleum Limited Sui Welding, Fabrication, Installation & Testing of Piping wells & Surface Fittings at Well No.45, Sui Gas Field 2001
33 Lasmo Oil Karachi Cutting, Welding 20" Pipe Casing, Connectors 8 Nos. at Karachi 2001
34 Pakistan Petroleum Limited Sui Installation, Fabrication & Welding of 20" Sleeves at Sui Gas Field 2001
35 Pakistan Petroleum Limited Sui Fabrication, Installation & Welding of 4" water header line at Compressor Station Sui Gas Field 2001
36 Pakistan Petroleum Limited Sui Replace Carbon Steel, Tanks & Piping of C.I. System with S/S Tanks & Piping at SFGCS 2002
37 Pakistan Petroleum Limited Sui Construction of Ground Bed at MP 20 for CP of 20" Water pipe line Sui- Kashmore Road 2002
38 Pakistan Petroleum Limited Sui Dismantling of C.S Corrosion Inhibitor tank A-104, A/F & C.S pipe fittings 2002
39 Pakistan Petroleum Limited Sui Welding, Fabrication, Installation & Testing of Piping & Surface Fittings at Well No.45, Sui Gas Field 2002
40 Pakistan Petroleum Limited Sui Fabrication & Installation of 1" dia pipe line with S/S storage tank for turbo Compressor C.I. tank Sui Gas Field 2002
41 Pakistan Petroleum Limited Sui Dismantling of C.S Corrosion Inhibitor tank A-104, A/F & C.S pipe fittings at Sui Gas Field 2002
S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
42 Pakistan Petroleum Limited Sui Fabrication & Installation of 1" dia pipe line with S/S storage tank fittings at Gas Scrubbers header North & South at Sui Gas Field 2002
43 Pakistan Petroleum Limited Sui Construction of 2" & 3" nominal pipe size instrument air lines at Sui 2002
44 Pakistan Petroleum Limited Adhi Construction of 4" dia feeder line for Adhi Well-5 2002
45 Pakistan Petroleum Limited Adhi Construction of 4" dia feeder line for Adhi Well-13 2002
46 Lasmo Oil Pakistan Limited Kadenwari Mechanical work & pipe line installation, electrical & instrumentation work at Kadenwari Field 2002
47 Pakistan Petroleum Limited Mazarani CP of 8" sales gas pipe line & Mazarani Gas processing plant 2002
48 Pakistan Petroleum Limited Sui Construction of 3", 4" & 6" dia pipe line & HP pump header fittings for Sui Effluent line, Sui 2002
49 Lasmo Oil Pakistan Limited Kadenwari 2" Condensate line modification job for permanent installation at Kadenwari Field 2002
50 Lasmo Oil Pakistan Limited Kadenwari Welding, Fabrication, Installation & relocation of sour Gas Line for choke control system at Miano Well-heads, Kadenwari Field 2002
51 Lasmo Oil Pakistan Limited Kadenwari Fabrication & welding of CSS pipe spools at well site, Kadenwari Field 2003
52 Pakistan Petroleum Limited Sui Manpower supply for Sui Gas Field emergency work 2003
53 Pakistan Petroleum Limited Kandhkot CP Monitoring & maintenance work at Kandhkot Gas Field 2003
54 OMV Pakistan Kadenwari Spill Blanketting System, Kadenwari Field 2003
55 OMV Pakistan Kadenwari Miano Condensate Recovery system, Kadenwari Field 2003
56 Pakistan Petroleum Limited Sui Construction of water storage tank of 150,000 US Gallons 2003
57 Mari Gas Company Limited Daharki Construction of U & O/H water storage tank, Parking & Equipment Sheds, Equipment Room, Rest Room Guard Room, Kitchen, Soaking pit & Septic tank 2003
58 Pakistan Petroleum Limited Mazarani Repair of 8" gas sales pipe line, Mazarani Gas Field 2003
59 Lasmo Oil Pakistan Limited Kadenwari Fabrication, welding & installation  of Vent piping spool (CS/Duplex) at Kadenwari Field 2003
60 Pakistan Petroleum Limited Mazarani CP System Monitoring & Maintenance, Mazarani Gas Field 2003
61 Pakistan Petroleum Limited Mazarani Supply of manpower for maintenance of Wells per month Mazarani Gas Field 2003
62 Pakistan Petroleum Limited Sui Construction of Ground for Well # 25 & 41 at Sui Gas Field 2003
63 Pakistan Petroleum Limited Adhi Construction of Porta Cabins for Safety Equipment including electrical fittings for RIG # H725, Adhi Gas Field 2004
64 Pakistan Petroleum Limited Adhi Supply & Installation of GB for CP at Adhi Well-14 casing & feeder line 2004
65 Pakistan Petroleum Limited Sui Construction of Condensate storage tank at De-Hydration Plant, Sui. 2004
66 Pakistan Petroleum Limited Kandhkot Construction / Welding / Installation of 16" dia loop Line & re-laying of section as buried line, Kandhkot Gas Field 2004
67 Pakistan Petroleum Limited Kandhkot Construction / Welding / Installation of Well # 24, Kandhkot Gas Field 2004
68 Pakistan Petroleum Limited Kandhkot Repair, maintenance of HT / LT panels, PFI Plant, generators, process instrument, Guages, Flow meters etc., Sui & Kandhkot 2004
69 Pakistan Petroleum Limited Sui & Kandhkot Supply / installation / testing & commissioning of Solar Power Units, Sui & Kandhkot 2004
70 Zeal Pak Cement Factory Hyderabad Fabrication & meter assembly work of Gas pipelines, Hyderabad 2004
71 Rohri Cement Works Rohri Fabrication & meter assembly work of Gas pipelines, Rohri 2004
72 Metropolitan Steel Mills Karachi Fabrication & Injector Burner assembly work of Gas pipe lines, Karachi 2004
73 MOL Pakistan Gurguri Supply of manpower & equipment, Gurguri Gas Field 2004
74 Sui Southern Gas Company Ltd. Interior Sindh Recoating work on 4, 6 & 8" dia Supply Main Gas Pipeline (Distribution Sindh) 2004-05
75 Pakistan Petroleum Limited Sui & Kandhkot Supply of skilled & other man power for Sui & Kandhkot Gas Fields 2004-05
76 Pakistan Petroleum Limited Sui Supply of skilled & other man power for Mazarani Gas Field 2004-05
77 Pakistan Petroleum Limited Adhi Construction / Welding / Installation of 6" dia buried Line & WHSF at  Adhi Well-16 2005
78 Pakistan Petroleum Limited Sui Construction of Ground Beds for 5 Sui Wells 2005
79 Pakistan Petroleum Limited Sui Repair / construction & commissioning of TEG at 3 Wells 2005
80 Pakistan Petroleum Limited Sui Coating & Wrapping 20" diameter water line KPS 2005
81 Pakistan Petroleum Limited Tajpur Block IEE & NOC, Tajpur Block 2005
82 Pakistan Petroleum Limited Kalat IEE & NOC, Kalat 2005
83 Pakistan Petroleum Limited Sui Construction of Condensate storage tank, water tank & raw water tanks at Sui. 2005
84 Pakistan Petroleum Limited Sui Supply of skilled & other man power for Sui & Kandhkot Gas Fields 2005-06
85 Pakistan Petroleum Limited Adhi Construction / Welding / Installation of 6" dia buried Line & WHSF at  Adhi Well-17 2005
86 Pakistan Refinery Limited Karachi Replacement of 250 ft. 8" & 10" pipe line in DHA Area 2005
87 Pakistan Petroleum Limited Sui Welding, Construction & Laying of 20" dia water line at Sui-KPS 2005-06
88 Pakistan Petroleum Limited Sui 5 Km water pipe line 20" dia water line welding / construction & laying work at Sui-KPS 2006
89 Pakistan Petroleum Limited Sui Installation of GBs at Sui Wells 2006
90 Pakistan Petroleum Limited Kandhkot Installation of GBs at Kandhkot Wells 2006
S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
91 Metropolitan Steel Mills Karachi Supply of skilled & other man power for Gas Field at Karachi 2005-06
92 Pakistan Petroleum Limited Mazarani High Pressure Gas welding services at Compresor Skid, Mazarani 2006
93 Pakistan Petroleum Limited Sui Supply of Man Power, Sui Gas Field 2006
94 Pakistan Petroleum Limited Sui Installation GBs at Sui Wells 2006-07
95 Pakistan Petroleum Limited Kandhkot Installation GBs at Kdt Wells 2006-07
96 Pakistan Petroleum Limited Sui 7 Km water pipe line 20" dia water line welding / construction & laying work at Sui-KPS 2007
97 Pakistan Petroleum Limited Barkhan IEE & NOC, Barkhan 2007
98 Pakistan Petroleum Limited Sui Additional 2 Km water pipe line 20" dia water line welding / construction & laying work at Sui-KPS 2007
99 Pakistan Petroleum Limited Mazarani Welding / Construction & laying of 4" dia buried feeder line & Wellhead Surface fittings, Mazarani 2007
100 Zhenhua Oil Company Block-3070-13 Baska IEE & NOC, Baska 2007
101 Mari Gas Company Limited Daharki Construction of Welhead facilities, Gathering lines, Central manifold & Piping Work, Daharki 2007
102 Mari Gas Company Limited Daharki Installation of Dehydration Plant and Flaring system at Mari Deep Central Manifold 2007
103 Mari Gas Company Limited Daharki Construction of 2 Nos., Condensate Oil Storage Tanks, Daharki 2007-08
104 Mari Gas Company Limited Daharki Design for Electrical work of Mari Deep Daharki 2007-08
105 Sui Southern Gas Company Ltd Sindh Recoating work on 4, 6 & 8" dia Supply Main Gas Pipeline (Distribution Sindh) 2008
106 Pakistan Petroleum Limited Sui Supply & Construction of Ground Beds at Sui Gas Field Wells 2008
107 Pakistan Petroleum Limited Sui-Kashmiore Pipe to replace 10 km of existing & operative water pipeline alongwith side Kashmore Road 2008
108 Pakistan Petroleum Limited Sui Welding/Construction/Laying of 20” diameter line pipe to replace 10 km of existing & operative water pipeline alongside Kashmore Road 2008
109 Pakistan Petroleum Limited Sui Supply of all Materials & Construction of Foundation of Raw Water Storage Tank at Gas Purification Plant, Sui Gas Field, of the following size: Inside Diameter: 16.760 meters Height: 7.506 meters 2008
110 Mari Gas Company Limited Sui Supply of all Materials - Removal of existingTank & Construction of Raw Water Storage Tank at Gas Purification Plant, Sui Gas Field, of the following size:Inside Diameter: 16.760 meters Height: 7.506 meters 2007-08
S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
111 Sui Southern Gas Company Ltd Sui Welding/Construction/Laying of 8” NPS Feeder Line for Well Sui-88 2009
112 Pakistan Petroleum Limited Sui Supply & Installation of Gratings at Adhi Field 2009
113 Bolan Mining Enterprises Khuzdar Supply of Grinding Mill MTM-160 at Khuzdar, Balochistan 2009
114 Engro Chemical Pakistan (Pvt) Ltd Daharki Pressure & Temperature Recording for 30", 16" & 12" pipe line 2009-2010
115 PETRONAS Carigali (Pakistan) Ltd Daharki Maintenance & upgrading of CP System 2010
116 Pakistan Petroleum Limited Kandhkot Machinery/equipment required for tie-in works at Gas Compression Plants and stand by Dehydration Unit 2010
117 Pakistan Petroleum Limited Chachar Manpower requirement during commissioning of centrifugal compressor. 2010
118 Pakistan Petroleum Limited Installation of PSV & Allied Piping Works 2010
119 Pakistan Petroleum Limited Kandhkot SCADA System 2011
120 Pakistan Petroleum Limited Adhi Construction of Sheds for Chemicals at Adhi Stores 2011
121 Pakistan Petroleum Limited Adam, HALA Construction of \Sheds for Condensate Loading Area 2011
122 Pakistan Petroleum Limited Adhi Welding / Construction / Laying of 6" dia buried Feeder Line at Adhi Gas Field 2011
123 Pakistan Petroleum Limited Adhi Construction of Sheds for Chemicals at Adhi Stores 2011
124 Pakistan Petroleum Limited Adam, HALA Construction of Sheds for Condensate Loading Area 2011
125 Pakistan Petroleum Limited Khuzdar IEE & NOC for Exploratory Drilling in Khuzdar Block 2011
126 Pakistan Petroleum Limited Adhi Welding / Construction / Laying of 6" dia buried Feeder Line at Adhi Gas Field 2011
127 Bolan Mining Enterprises Khuzdar Erection, Electrication & Installation of Grinding Mill MTM-160 2011
128 Pakistan Petroleum Limited Sui & Kandhkot Welding, Fabriction & Grinding Services at Sui & Kandhkot Gas Fields for 3 years 1.7.2011 to 30.6.2014 2011
129 Pakistan Petroleum Limited Adhi Construction of 2 Sheds at Stores Adhi Field 2012
130 Pakistan Petroleum Limited Kandhkot Rehabilitation of Access Road & Construction of Gas Gathering Main & Feeder Lines, Kandhkot Gas Field 2012
131 Pakistan Petroleum Limited Sui - KPS Repair / Maintenance of Water Storage Tanks Nos.H-1, H-3 & M-10 at Sui and Tank Nos. 4 & 5 at Khewali Pump Station (KPS) near Kashmore 2012
132 Pakistan Petroleum Limited Sui Supply of material for Construction of Ground Beds for Sui Wells (2011-12) 2012
133 Pakistan Petroleum Limited Sui Supply of all Materials including Tank and Interpiping Material & Construction of 6 Nos., Vertical Cylindrical, above ground Steel Storage Tanks for Water Service 2012
S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
134 Pakistan Petroleum Limited Sui Supply of all Materials including & Construction of 2 Nos. Vertical Cylindrical, above ground Steel Storage Tanks Capacity 350,000 Gallons each for Water Service to Replace Existing Tanks at Purifiction Plant, Sui 2012
135 Pakistan Petroleum Limited Sui - KPS Welding / Construction / Laying of 20 dia Line Pipe to replace 4.8 km long existing & operative Sui-KPS Water Pipeline Section between MP-32 to MP-35 2012
136 Sui Southern Gas Company Ltd. Karachi Overhead leak survey & Rectification of 5,000 Connections 2012
137 Pakistan Petroleum Limited (PPL) Kandhkot Welding / Construction / Laying of 8" NPS Undergriound M.S. Line Pipe for Feeder Line for Well Kandhkot-28 2012
138 Pakistan Petroleum Limited Sui - KPS Supply of material for Construction of Ground Beds for CP System of 20" dia Main Sui-KPS Water Line 2012
139 Pakistan Petroleum Limited Sui Renewal of Ground Beds of Sui Wells 2012
140 Pakistan Petroleum Limited Sui Supply of material for Construction of Ground Bds for CP System of 20" dia Sui-KPS Water Line 2012
141 Pakistan Petroleum Limited HALA Welding & Fabrication of Flare Line 2012
142 Pakistan Petroleum Limited Sui - KPS Miscellaneous Works at Rig Yard, Kandhkot 2012
143 Pakistan Petroleum Limited Adhi Initial Environment Examination & No Objection Certificate for Field Development of Adhi LPG-NGL Recovery Plant-III 2012
142 Pakistan Petroleum Limited Nausherwani IEE Nausherwani Blocks 2013
143 Pakistan Petroleum Limited Sadiqabad, Hisal & Karsal Blocks, Punjab IEE & EIA Punjab 2013
144 Pakistan Petroleum Limited HALA Feeder Line & Surface Fitting at Hala EPF Facility 2013
145 Pakistan Petroleum Limited Kandhkot Welding/Construction/Laying of 8" NPS Underground MS Line Pipe fpr Feeder :Line for Well Kandhkot-28 2013
146 Pakistan Petroleum Limited Gambat All Civil Works of Construction of Access Road Well Location for 3rd Exploratory Well Gambat South 2013
147 Pakistan Petroleum Limited Sui 6" NPS Feeder Line for Well Sui-98(U) Sui Gas Field 2013
148 Pakistan Petroleum Limited Sui Hiring of PC Contractor for LPG Bowser Loading facility project at Adhi Field 2013
S.# CLIENT LOCATION WORKS DESCRIPTION YEAR OF AWARD
149 Pakistan Petroleum Limited Adhi Replacement of Bottom Plates of NGL Storage Tank at Adhi Field 2013
150 Pakistan Petroleum Limited Gambat Construction of Access Road & Well Location 2014
151 Pakistan Petroleum Limited Gambat Consultancy Services for Conducting Initial Environment Examination & No Objection Certificate for Construction & Commissioning of Extended Well Testing Plant & Pipelines 2014
152 Pakistan Petroleum Limited Chachar Construction / welding / installation of 4" dia buried / above ground pipeline from Chachar Plant to Well Kandhkot-3 2014
153 Pakistan Petroleum Limited Kandhkot Landscaping & Miscellaneous Civil Works near Club House Building, Kandhkot 2013
154 Pakistan Petroleum Limited Kinza Welding/construction/laying of 8" dia underground / above ground pipelines including wellhead surface fittings from Kinza Well to Sharaf Plant 2015
155 Pakistan Petroleum Limited Shahdadpur Welding / construction / laying of 16" dia underground / above ground Sales Gas Line from Sharaf Plant to RS3 Valve Assembly 2015
156 Pakistan Petroleum Limited Hala Welding / construction ./ laying of 8" dia underground / aboeground pipeline including wellhead surface fittings from Well Adam West X-1 to HALA Plant 2015
157 Pakistan Petroleum Limited Chachar Relocation job of Gas Plant from Chachar to Gambat South Block as under: 1) Dismantling, relocation of Chachar Gas Processing Facility to Gambat South Block Shahdadpur & complete erection / installation, piping, testing & commissioning of Plant 2) Design & construction of 3 Condensate Storage Tanks of 500 bbl capacity at Sharaf Gas Proessing Facility, including calibration of all instruments and commissioning. 2015
158 Pakistan Petroleum Limited HALA Acquisition of IEE & NOC for Seismic Survey & Multiple Drilling Activities 2015