S.# CLIENT LOCATION WORK DESCRIPTION    YEAR OF AWARD
1 Pakistan Petroleum Limited Sui CP Audit of 88 Wells at Field in association with Gary International U.K. Ltd.   1995
2 Pakistan Petroleum Limited Sui Welding of 30′ long 14″ dia metr full sleeves on 14″ gas gathering main at Sui Gas Field   1996
3 Pakistan Petroleum Limited Sui Welding of 2 Nos. 6′-10″ & 7′-6″ long 30″ dia full sleeve on Compression 30″ discharge pipe line   1997
4 Pakistan Petroleum Limited Adhi Welding work for Plant inlet manifold at Adhi Well No.12   1997
5 Pakistan Petroleum Limited Sui Welding of 8″ 2 Nos. full dia sleeves on feeder line & replacement of 3 lengths 6″ pipe line   1997
6 Pakistan Petroleum Limited Sui Welding of drain line at dehydration plant   1997
7 Pakistan Petroleum Limited Sui Supply & fabrication of steel clamps for 18″ pipe line   1997
8 Sui Southern Gas Company Ltd Sui CP Consultancy in association with Gary International U.K. Ltd. For A Unit   1997
9 Pakistan Petroleum Limited Adhi CP Design for Adhi Well No.12 gasing & feeder line   1997
10 Pakistan Petroleum Limited Kandhkot Yearly maintenance CP System of Kandhkot Gas Field   1997
11 Pakistan Petroleum Limited Sui Construction & Installation of 4 Nos. Ground Beds for CP System   1997
12 Pakistan Petroleum Limited Sui Construction of 50 BBL trip tank for H-725 drilling out fit.   1998
13 Pakistan Petroleum Limited Sui Construction & installation of Ground Bed for CP System   1998
14 Pakistan Petroleum Limited Sui Repair of Thermo Electric Generators & Solar Power Units and spares installation for electronic panels.   1998
15 Pakistan Petroleum Limited Sui Construction of Hydrant System at DHP & TSHF, Sui Gas Field   1998
16 Pakistan Petroleum Limited Kandhkot Construction of Hydrant System at DHP & TSHF, Kandhkot Gas Field   1998
17 Pakistan Petroleum Limited Sui Hydro testing of 4 Nos. valves and 6″ Tee, Sui Gas Field   1999
18 Pakistan Petroleum Limited Sui 20″ dia pipe line coating & wrapping for 4.5 km at Sui Gas Field   1999
19 Pakistan Refinery Limited Karachi PCM Survey coating & wrapping as per recommendation of PRL for 16″ & 18″ Oil lines   1999
20 Pakistan Petroleum Limited Sui Repair of Chart Integrator / Flow Scanners at Sui Gas Field   1999
21 Pakistan Petroleum Limited Kandhkot Yearly maintenance of CP System, Kandhkot.   1999
22 Pakistan Petroleum Limited Kandhkot Construction of Condensate / Oil storage tank, Kandhkot.   2000
23 Pakistan Petroleum Limited Adhi Welding, Fabrication, Installation & Testing Piping & Surface Fittings at Adhi Well No.9   2000
24 Pakistan Scientific Institute of Research Karachi Installation of HVAC System for auditorium of Institute of Industrial Electronic Engineers, Karachi   2000
25 Pakistan Petroleum Limited Adhi Welding, Fabrication, Installation & Testing of Piping wells & Surface Fittings at Well No.10, Adhi   2000
26 Pakistan Petroleum Limited Sui Fabrication, Installation & Welding of Well Head Surface Fitting & construction of 10″ feeder line for Pub-2 Well 4.5 km, Sui Gas Field   2000
27 Attock Cement Factory Hub Design & construction of CP System at Attock Cement Factory for 8″ gas pipeline & structure at Hub Baluchistan.   2001
28 Pakistan Petroleum Limited Sui Installation of above ground condensate drain line at Sui Field Gas Compressor Station   2001
29 Pakistan Petroleum Limited Sui Welding / installation / modification of 16″ ball valve at North & South header, Sui Gas Field   2001
30 Pakistan Petroleum Limited Kandhkot Supply of manpower – Welder, Fabricator & Grinder man, Kandhkot Gas Field   2001
31 M/s Ayub Brothers Rawalpindi Installation of sacrificial anodes & Ground Bed of water pipe line diameter 36″ at Rawalpindi   2001
32 Pakistan Petroleum Limited Sui Welding, Fabrication, Installation & Testing of Piping wells & Surface Fittings at Well No.45, Sui Gas Field   2001
33 Lasmo Oil Karachi Cutting, Welding 20″ Pipe Casing, Connectors 8 Nos. at Karachi   2001
34 Pakistan Petroleum Limited Sui Installation, Fabrication & Welding of 20″ Sleeves at Sui Gas Field   2001
35 Pakistan Petroleum Limited Sui Fabrication, Installation & Welding of 4″ water header line at Compressor Station Sui Gas Field   2001
36 Pakistan Petroleum Limited Sui Replace Carbon Steel, Tanks & Piping of C.I. System with S/S Tanks & Piping at SFGCS   2002
37 Pakistan Petroleum Limited Sui Construction of Ground Bed at MP 20 for CP of 20″ Water pipe line Sui- Kashmore Road   2002
38 Pakistan Petroleum Limited Sui Dismantling of C.S Corrosion Inhibitor tank A-104, A/F & C.S pipe fittings   2002
39 Pakistan Petroleum Limited Sui Welding, Fabrication, Installation & Testing of Piping & Surface Fittings at Well No.45, Sui Gas Field   2002
40 Pakistan Petroleum Limited Sui Fabrication & Installation of 1″ dia pipe line with S/S storage tank for turbo Compressor C.I. tank Sui Gas Field   2002
41 Pakistan Petroleum Limited Sui Dismantling of C.S Corrosion Inhibitor tank A-104, A/F & C.S pipe fittings at Sui Gas Field   2002
42 Pakistan Petroleum Limited Sui Fabrication & Installation of 1″ dia pipe line with S/S storage tank fittings at Gas Scrubbers header North & South at Sui Gas Field   2002
43 Pakistan Petroleum Limited Sui Construction of 2″ & 3″ nominal pipe size instrument air lines at Sui   2002
44 Pakistan Petroleum Limited Adhi Construction of 4″ dia feeder line for Adhi Well-5   2002
45 Pakistan Petroleum Limited Adhi Construction of 4″ dia feeder line for Adhi Well-13   2002
46 Lasmo Oil Pakistan Limited Kadenwari Mechanical work & pipe line installation, electrical & instrumentation work at Kadenwari Field   2002
47 Pakistan Petroleum Limited Mazarani CP of 8″ sales gas pipe line & Mazarani Gas processing plant   2002
48 Pakistan Petroleum Limited Sui Construction of 3″, 4″ & 6″ dia pipe line & HP pump header fittings for Sui Effluent line, Sui   2002
49 Lasmo Oil Pakistan Limited Kadenwari 2″ Condensate line modification job for permanent installation at Kadenwari Field   2002
50 Lasmo Oil Pakistan Limited Kadenwari Welding, Fabrication, Installation & relocation of sour Gas Line for choke control system at Miano Well-heads, Kadenwari Field   2002
51 Lasmo Oil Pakistan Limited Kadenwari Fabrication & welding of CSS pipe spools at well site, Kadenwari Field   2003
52 Pakistan Petroleum Limited Sui Manpower supply for Sui Gas Field emergency work   2003
53 Pakistan Petroleum Limited Kandhkot CP Monitoring & maintenance work at Kandhkot Gas Field   2003
54 OMV Pakistan Kadenwari Spill Blanketting System, Kadenwari Field   2003
55 OMV Pakistan Kadenwari Miano Condensate Recovery system, Kadenwari Field   2003
56 Pakistan Petroleum Limited Sui Construction of water storage tank of 150,000 US Gallons   2003
57 Mari Gas Company Limited Daharki Construction of U & O/H water storage tank, Parking & Equipment Sheds, Equipment Room, Rest Room Guard Room, Kitchen, Soaking pit & Septic tank   2003
58 Pakistan Petroleum Limited Mazarani Repair of 8″ gas sales pipe line, Mazarani Gas Field   2003
59 Lasmo Oil Pakistan Limited Kadenwari Fabrication, welding & installation  of Vent piping spool (CS/Duplex) at Kadenwari Field   2003
60 Pakistan Petroleum Limited Mazarani CP System Monitoring & Maintenance, Mazarani Gas Field   2003
61 Pakistan Petroleum Limited Mazarani Supply of manpower for maintenance of Wells per month Mazarani Gas Field   2003
62 Pakistan Petroleum Limited Sui Construction of Ground for Well # 25 & 41 at Sui Gas Field   2003
63 Pakistan Petroleum Limited Adhi Construction of Porta Cabins for Safety Equipment including electrical fittings for RIG # H725, Adhi Gas Field   2004
64 Pakistan Petroleum Limited Adhi Supply & Installation of GB for CP at Adhi Well-14 casing & feeder line   2004
65 Pakistan Petroleum Limited Sui Construction of Condensate storage tank at De-Hydration Plant, Sui.   2004
66 Pakistan Petroleum Limited Kandhkot Construction / Welding / Installation of 16″ dia loop Line & re-laying of section as buried line, Kandhkot Gas Field   2004
67 Pakistan Petroleum Limited Kandhkot Construction / Welding / Installation of Well # 24, Kandhkot Gas Field   2004
68 Pakistan Petroleum Limited Kandhkot Repair, maintenance of HT / LT panels, PFI Plant, generators, process instrument, Guages, Flow meters etc., Sui & Kandhkot   2004
69 Pakistan Petroleum Limited Sui & Kandhkot Supply / installation / testing & commissioning of Solar Power Units, Sui & Kandhkot   2004
70 Zeal Pak Cement Factory Hyderabad Fabrication & meter assembly work of Gas pipelines, Hyderabad   2004
71 Rohri Cement Works Rohri Fabrication & meter assembly work of Gas pipelines, Rohri   2004
72 Metropolitan Steel Mills Karachi Fabrication & Injector Burner assembly work of Gas pipe lines, Karachi   2004
73 MOL Pakistan Gurguri Supply of manpower & equipment, Gurguri Gas Field   2004
74 Sui Southern Gas Company Ltd. Interior Sindh Recoating work on 4, 6 & 8″ dia Supply Main Gas Pipeline (Distribution Sindh)   2004
75 Pakistan Petroleum Limited Sui & Kandhkot Supply of skilled & other man power for Sui & Kandhkot Gas Fields   2004
76 Pakistan Petroleum Limited Sui Supply of skilled & other man power for Mazarani Gas Field   2004
77 Pakistan Petroleum Limited Adhi Construction / Welding / Installation of 6″ dia buried Line & WHSF at  Adhi Well-16   2005
78 Pakistan Petroleum Limited Sui Construction of Ground Beds for 5 Sui Wells   2005
79 Pakistan Petroleum Limited Sui Repair / construction & commissioning of TEG at 3 Wells   2005
80 Pakistan Petroleum Limited Sui Coating & Wrapping 20″ diameter water line KPS   2005
81 Pakistan Petroleum Limited Tajpur Block IEE & NOC, Tajpur Block   2005
82 Pakistan Petroleum Limited Kalat IEE & NOC, Kalat   2005
83 Pakistan Petroleum Limited Sui Construction of Condensate storage tank, water tank & raw water tanks at Sui.   2005
84 Pakistan Petroleum Limited Adhi Construction / Welding / Installation of 6″ dia buried Line & WHSF at  Adhi Well-17   2005
85 Pakistan Refinery Limited Karachi Replacement of 250 ft. 8″ & 10″ pipe line in DHA Area   2005
86 Pakistan Petroleum Limited Sui Supply of skilled & other man power for Sui & Kandhkot Gas Fields   2005
87 Pakistan Petroleum Limited Sui Welding, Construction & Laying of 20″ dia water line at Sui-KPS   2005
88 Metropolitan Steel Mills Karachi Supply of skilled & other man power for Gas Field at Karachi   2005
89 Pakistan Petroleum Limited Sui 5 Km water pipe line 20″ dia water line welding / construction & laying work at Sui-KPS   2006
90 Pakistan Petroleum Limited Sui Installation of GBs at Sui Wells   2006
91 Pakistan Petroleum Limited Kandhkot Installation of GBs at Kandhkot Wells   2006
92 Pakistan Petroleum Limited Mazarani High Pressure Gas welding services at Compresor Skid, Mazarani   2006
93 Pakistan Petroleum Limited Sui Supply of Man Power, Sui Gas Field   2006
94 Pakistan Petroleum Limited Sui Installation GBs at Sui Wells   2006
95 Pakistan Petroleum Limited Kandhkot Installation GBs at Kdt Wells   2006
96 Pakistan Petroleum Limited Sui 7 Km water pipe line 20″ dia water line welding / construction & laying work at Sui-KPS   2007
97 Pakistan Petroleum Limited Barkhan IEE & NOC, Barkhan   2007
98 Pakistan Petroleum Limited Sui Additional 2 Km water pipe line 20″ dia water line welding / construction & laying work at Sui-KPS   2007
99 Pakistan Petroleum Limited Mazarani Welding / Construction & laying of 4″ dia buried feeder line & Wellhead Surface fittings, Mazarani   2007
100 Zhenhua Oil Company Block-3070-13 Baska IEE & NOC, Baska   2007
101 Mari Gas Company Limited Daharki Construction of Welhead facilities, Gathering lines, Central manifold & Piping Work, Daharki   2007
102 Mari Gas Company Limited Daharki Installation of Dehydration Plant and Flaring system at Mari Deep Central Manifold   2007
103 Mari Gas Company Limited Daharki Design for Electrical work of Mari Deep Daharki   2007
104 Mari Gas Company Limited Daharki Construction of 2 Nos., Condensate Oil Storage Tanks, Daharki   2007
105 Mari Gas Company Limited Sui Supply of all Materials  –  Removal  of existingTank & Construction of  Raw Water Storage Tank at Gas Purification Plant, Sui Gas Field,  of the following size:Inside          Diameter:  16.760 meters                                Height:        7.506 meters   2007
106 Sui Southern Gas Company Ltd Sindh Recoating work on 4, 6 & 8″ dia Supply Main Gas Pipeline (Distribution Sindh)   2008
107 Pakistan Petroleum Limited Sui Supply & Construction of Ground Beds at Sui Gas Field Wells   2008
108 Pakistan Petroleum Limited Sui-Kashmiore Pipe to replace 10 km of existing & operative water pipeline alongwith side Kashmore Road   2008
109 Pakistan Petroleum Limited Sui  Welding/Construction/Laying of 20” diameter line pipe to replace 10 km of existing & operative water pipeline alongside Kashmore Road   2008
110 Pakistan Petroleum Limited Sui Supply of all Materials & Construction of Foundation  of Raw Water Storage Tank at Gas Purification Plant, Sui Gas Field, of the following size:   Inside Diameter:  16.760 meters                                             Height:  7.506 meters   2008
111 Sui Southern Gas Company Ltd Sui Welding/Construction/Laying of 8” NPS Feeder Line for Well Sui-88   2009
112 Pakistan Petroleum Limited Sui Supply & Installation of Gratings at Adhi Field   2009
113 Bolan Mining Enterprises Khuzdar Supply of Grinding Mill MTM-160 at Khuzdar, Balochistan   2009
114 Engro Chemical Pakistan (Pvt) Ltd Daharki Pressure & Temperature Recording for 30″, 16″ & 12″ pipe line   2009
115 PETRONAS Carigali (Pakistan) Ltd Daharki Maintenance & upgrading of CP System   2010
116 Pakistan Petroleum Limited Kandhkot Machinery/equipment required for tie-in works at Gas Compression Plants and stand by Dehydration Unit   2010
117 Pakistan Petroleum Limited Chachar Manpower requirement during commissioning of centrifugal compressor.   2010
118 Pakistan Petroleum Limited Chachar Installation of PSV & Allied Piping Works   2010
119 Pakistan Petroleum Limited Kandhkot SCADA System   2011
120 Pakistan Petroleum Limited Adhi Construction of Sheds for Chemicals at Adhi Stores   2011
121 Pakistan Petroleum Limited Adam, HALA Construction of \Sheds for Condensate Loading Area   2011
122 Pakistan Petroleum Limited Adhi Welding / Construction / Laying of 6″ dia buried Feeder Line at Adhi Gas Field   2011
123 Pakistan Petroleum Limited Adhi Construction of Sheds for Chemicals at Adhi Stores   2011
124 Pakistan Petroleum Limited Adam, HALA Construction of Sheds for Condensate Loading Area   2011
125 Pakistan Petroleum Limited Khuzdar IEE & NOC for Exploratory Drilling in Khuzdar Block   2011
126 Pakistan Petroleum Limited Adhi Welding / Construction / Laying of 6″ dia buried Feeder Line at Adhi Gas Field   2011
127 Bolan Mining Enterprises Khuzdar Erection, Electrication & Installation of Grinding Mill MTM-160   2011
128 Pakistan Petroleum Limited Sui & Kandhkot Welding, Fabriction & Grinding Services at Sui  & Kandhkot Gas Fields for 3 years 1.7.2011 to 30.6.2014   2011
129 Pakistan Petroleum Limited Adhi Construction of 2 Sheds at Stores Adhi Field   2012
130 Pakistan Petroleum Limited Kandhkot Rehabilitation of Access Road & Construction of Gas Gathering Main & Feeder Lines, Kandhkot Gas Field   2012
131 Pakistan Petroleum Limited Sui – KPS Repair / Maintenance of Water Storage Tanks Nos.H-1, H-3 & M-10 at Sui and Tank Nos. 4 & 5 at Khewali Pump Station (KPS) near Kashmore   2012
132 Pakistan Petroleum Limited Sui Supply of material for Construction of Ground Beds for Sui Wells (2011-12)   2012
133 Pakistan Petroleum Limited Sui Supply of all Materials including Tank and Interpiping Material & Construction of 6 Nos., Vertical Cylindrical, above ground Steel Storage Tanks for Water Service   2012
134 Pakistan Petroleum Limited Sui Supply of all Materials including & Construction of 2 Nos.  Vertical Cylindrical, above ground Steel Storage Tanks Capacity 350,000 Gallons each for Water Service to Replace Existing Tanks at Purifiction Plant, Sui   2012
135 Pakistan Petroleum Limited Sui – KPS Welding / Construction / Laying of 20″ dia Line Pipe to replace 4.8 km long existing & operative Sui-KPS Water Pipeline Section between MP-32 to MP-35   2012
136 Sui Southern Gas Company Ltd. Karachi Overhead leak survey & Rectification of 5,000 Connections   2012
137 Pakistan Petroleum Limited (PPL) Kandhkot Welding / Construction / Laying of 8″ NPS Undergriound M.S. Line Pipe for Feeder Line for Well Kandhkot-28   2012
138 Pakistan Petroleum Limited Sui – KPS Supply of material for Construction of Ground Beds for CP System of 20″ dia Main Sui-KPS Water Line
2012
139 Pakistan Petroleum Limited Sui Renewal of Ground Beds of Sui Wells   2012
140 Pakistan Petroleum Limited Sui Supply of material for Construction of Ground Bds for CP System of 20″ dia Sui-KPS Water Line   2012
141 Pakistan Petroleum Limited HALA Welding & Fabrication of Flare Line   2012
142 Pakistan Petroleum Limited Sui – KPS Miscellaneous Works at Rig Yard, Kandhkot   2012
143 Pakistan Petroleum Limited Adhi Initial Environment Examination  & No Objection Certificate  for Field Development of Adhi LPG-NGL Recovery Plant-III   2012
144 Pakistan Petroleum Limited Nausherwani IEE Nausherwani Blocks   2013
145 Pakistan Petroleum Limited Sadiqabad, Hisal & Karsal Blocks, Punjab IEE & EIA  Punjab   2013
146 Pakistan Petroleum Limited HALA Feeder Line & Surface Fitting at Hala EPF Facility   2013
147 Pakistan Petroleum Limited Kandhkot Welding/Construction/Laying of 8″ NPS Underground MS Line Pipe fpr Feeder :Line for Well Kandhkot-28   2013
148 Pakistan Petroleum Limited Gambat All Civil Works of Construction of Access Road Well Location for 3rd Exploratory Well Gambat South   2013
149 Pakistan Petroleum Limited Sui 6″ NPS Feeder Line for Well Sui-98(U) Sui Gas Field   2013
150 Pakistan Petroleum Limited Sui Hiring of PC Contractor for LPG Bowser Loading facility project at Adhi Field   2013
151 Pakistan Petroleum Limited Adhi Replacement of Bottom Plates of NGL Storage Tank at Adhi Field   2013
152 Pakistan Petroleum Limited Kandhkot Landscaping & Miscellaneous Civil Works near Club House Building, Kandhkot   2013
153 Pakistan Petroleum Limited Gambat Construction of Access Road & Well Location   2014
154 Pakistan Petroleum Limited Gambat Consultancy Services for Conducting Initial Environment Examination  & No Objection Certificate  for  Construction & Commissioning of Extended Well Testing Plant & Pipelines   2014
155 Pakistan Petroleum Limited Chachar Construction / welding / installation of 4″ dia buried / above ground pipeline from Chachar Plant to Well Kandhkot-3   2014
156 Pakistan Petroleum Limited Kinza Welding/construction/laying of 8″ dia underground / above ground pipelines including wellhead surface fittings from Kinza Well to Sharaf Plant   2015
157 Pakistan Petroleum Limited Shahdadpur Welding / construction / laying of 16″ dia underground / above ground Sales Gas Line from Sharaf Plant to RS3 Valve Assembly   2015
158 Pakistan Petroleum Limited Hala Welding / construction ./ laying of 8″ dia underground / aboeground pipeline including wellhead surface fittings from Well Adam West X-1 to HALA Plant   2015
159 Pakistan Petroleum Limited Chachar

Relocation job of Gas Plant from Chachar to Gambat South Block as under:

1)  Dismantling, relocation  of Chachar Gas Processing Facility  to Gambat South Block Shahdadpur & complete erection / installation,  piping, testing & commissioning of Plant.

2)  Design & construction of 3 Condensate Storage Tanks of 500 bbl capacity at Sharaf Gas Proessing Facility, including calibration of all instruments and commissioning.

  2015
160 Pakistan Petroleum Limited Gambat Welding/Construction/Laying of 16” NPS Diameter x 9KM underground/ above ground Sale Gas Pipelines from Sharf Plant to RS3 Valve Assembly at Gambat South   2015
161 Pakistan Petroleum Limited Gambat Welding/Construction/Laying of 8” Diameter nderground/ above ground including well head surface fittings for Well Shahdad X-1 to Sharaf Plant at Gambat South   2016
162 Pakistan Petroleum Limited Adhi Construction/Welding/Installation of 6” Dia Buried Feeder Line for Well dhi-25, Adhi (T/K) Punjab   2016
163 Sui Southern Gas Company Limited Karachi – Hyderabad Construction of 42” Dia x 135.6 KM RLNG-II Pipeline from SMS, Pakland Karachi to HQ-3 Hyderabad (Work Contract No. SSGC/SC/6503/CONT-2667/2016)   2017
164 Pakistan Petroleum Limited Adhi Construction/Welding/Laying 16″ NPS, Under Ground Loop Lines Including Above Ground Sections of Loop Lines Parallel to Section-3, 4 & 5 & Section-2 at KandhKot Gas Field   2017
165 Pakistan Petroleum Limited Adhi Construction/ Welding/Installation of 6″ Dia Burried Feeder Line for Well Adhi-Well-26 (T/K) & Adhi-Well-27 (T/K) @ Adhi Field.PUNJAB.   2017
166 ENI Pakistan Limited Bhit EC0666: Bhit Compression Phase-III – Restaging & Fuel Gas Modification at Bhit 6 Booster Compressor   2018
167 ENI Pakistan Limited Bhit EC0666: Bhit Compression Phase-III – Restaging & Fuel Gas Modification at Bhit 6 Booster Compressor   2018
168 ENI Pakistan Limited Bhit Restaging & Fuel Gas Modification at Bhit 3 Booster Compressor   2019
169 ENI Pakistan Limited Bhit Restaging & Fuel Gas Modification at Bhit 3 Booster Compressor   2019
170 ENI Pakistan Limited Bhit Replacement of Train – 1 & 2 Amine Unit Corroded CS Pipe Spools & Fitting With SS   2019
171 Pakistan Petroleum Limited Naushero Construction of Access Road & Well Site Location for Nusrat X-1 at Nausharo Feroz X-1   2019
172 Pak-Arab Refnery Limited Karachi Coating Refurbishment work on 4.5KM Length of 16″ dia KMK Pipeline in Section-I, Karachi.   2020
173 ENI Pakistan Limited Bhit MR Works – Water Ring in Project Camp.   2020
174 ENI Pakistan Limited Bhit Bhit Compression Phase 4 Installation of WHCP Piping Modification for Permenant By-Pass of Nodal Compressor At Bhit # 2   2020
175 Pakistan Petroleum Limited Gambat Design, Procurement, Construction/Installation and Testing of Condensate Storage Facility at Gambat (03 Nos. Tanks) South GPF-IV   2021
176 Fauji Oil Terminal and Distribution Co. Ltd Karachi Construction and Installation of Separate Headers at Jetty & P1 Area   2022